Jeremiah Burke High School
Extensive renovations to the Existing High School
and a New Addition including a High School Library, Gymnasium,
New Public Library and Community Center.  |
 |
 |
Renovations to the War Memorial Building at the Cambridge Rindge and Latin School
W.T. Rich Company was responsible for extensive renovations of the existing 28,000 square foot War Memorial Field House and Gymnasium at the Cambridge Rindge and Latin High School.  |
 |
 |
New Elizabeth Pole Elementary School
New construction of 100,000 square foot, two-story elementary school.  |
 |
 |
Boston Public Library, McKim Building
The Boston Public Library McKim Building project consisted of renovation and historical restoration work at one of Boston’s preeminent historical landmarks.  |
 |
 |
Boston Young Men’s Christian Union (BYMCU) Facility Renovations
The BYMCU project was one of the most challenging to date for W.T. Rich Company. The BYMCU is America’s oldest continually operating athletic facility.  |
 |
 |
New United Airlines Hangar
W. T. Rich Company was engaged by Rubb Building Systems to construct a new United Airlines hangar at Logan Airport.  |
 |
 |
Thomas Crane Public Library
The Thomas Crane Public Library is considered one of the finest small-scale Romanesque Revival designs by Richardson, who is best known as the architect of Trinity Church in Copley Square in Boston.  |
 |
 |
Suffolk County High Rise Courthouse
W.T. Rich Company completed extensive renovations to this 26 story high-rise building. The work encompassed major upgrades and replacement of MEP systems, a new security system and a new fire protection system.  |
 |
 |
Chinatown Park, Central Artery / Tunnel Surface Project
Chinatown Park is one of three Central Artery / Tunnel Surface Projects that comprise the Rose Fitzgerald Greenway.  |
 |
 |
Holland School Exterior Wall Replacement
Due to a failing exterior wall system, the City of Boston and the Boston Public Schools department required a major remodeling of the John P. Holland School in Dorchester, MA.  |
 |
 |
Holland Elementary School Interior Renovations
The City of Boston and the Boston Public Schools required a major remodeling of the John P. Holland School in Dorchester, MA.  |
 |
 |
MCI Concord Prison Expansion
This project consisted of the construction of a new, prefab detention building and complete renovation of existing detention building.  |
 |
 |
MBTA Cabot Bus Facility
The MBTA Cabot Bus Facility is one of the major hosts for Storage, Fueling, Maintenance and Cleaning of Boston’s Busing Operations.  |
 |
 |
New Hamilton Public Safety Complex
The project consisted of the new construction of a 25,000 square foot public safety complex to house the town’s police department, fire department and emergency dispatch center.  |
 |
 |
Engine #8 Fire Station Renovation
This historic and beautiful structure required renovation due to the increased size of the City’s fire truck engines.  |
 |
 |
Lemuel Shattuck Hospital Boiler Replacement
The Shattuck Hospital required the complete replacement of existing boiler plant while the hospital remained fully operational.  |
 |
 |
Johnson Elementary School Addition and Renovations
The Johnson School project consisted of the new construction of a 16,000 square foot classroom wing addition and a major renovation of 25,000 square feet of existing classrooms, offices, the gymnasium and the cafeteria.  |
 |
 |
Bremen Street Park Fountain Pavilion
The Bremen Street Park Fountain Pavilion project consisted of the new construction of a 1,300 square foot pavilion building within the newly constructed Bremen Street
Park.  |